Microwave Metal Heating and Sintering Furnace
* Speedy Reaction, High Efficacy, Low Maintenance Cost by 2.45GHz Microwave
* Applied Design to 2.45GHz Microwave with LG Magnetron
Power | 1000W | 2000W |
|
Feature | |
Model |
LUS210CMF |
LUS220CMF |
Internal Structure |
Chamber |
|
Photo |
|
|
|
||
Max Temp(℃) |
1600℃ |
1600℃ |
● Metal Heating and Sintering Method by 2.45GHz Microwave● Speedy Heating / It takes 40~45min to 1550℃(Time -Shortening to 1/5 of Convectional Heater Type )● Low Maintenance and Low Repair Cost(No need Heater Exchange, 1/3 Maintainance Cost of Heater Type)● Simple Installation, Household Single Phase(No need Other Power Line)● Chamber Size can be applied by Usage Purpose● Maximizing Production by much Faster Heating Process( 4~5 times faster than Convectional Heater)● No Crack, No Tilting on Metal, High Strength ● can be appied to all of Metal Heating and SinteringEspecially Dental Zr (Zirconia Sintering) |
||
Operating Temp |
1400~1550℃ |
1400~1550℃ | |||
Input |
AC 220V*60/50Hz (1450W) |
AC 220V*60/50Hz (2900W) |
|||
Program |
10 Steps by Manual |
10 Steps by Manual |
|||
Size(L*W*H) |
395x500x440mm |
395x500x540mm |
|||
Chamber Size |
115*105*45mm |
115*105*65mm |
|||
Weight |
35 Kgs |
45 Kgs |
|||
Magnetron | LG 2M286 | LG 2M286 |
[ Contrast of Microwave Furnace and Convectional Heater Furnace ]
Factor |
Microwave Furnace |
Convectional Heater Furnace |
Method |
2.45GHz CW Microwave Heating |
Filament Convectional Heating |
Size(mm) |
395D x 500W x 440H |
So Larger |
Weight(Kgs) |
35 Kgs(So Light) |
60~80 Kga(So Heavy) |
Cycle Time(Hrs) |
Heating 2Hrs+Cooling 1.5Hrs |
Heating 5Hrs+ Cooling 8Hrs |
Power(W) |
1,100 Watts(High Efficacy) |
15,000 Watts(Low Efficacy) |
Power Line |
Household / Single Phase(50/60Hz) |
Industrial 3Phase, Need Power Line |
Production |
4~5 times per Day(High Production) |
1~2 times per Day(Low Production) |
Structure |
No Crack, No Tilting |
Weak to Crack, Tilting |
Microwave High Temp Reactor Furnace
LUS101HMF
|
■ Electrical Specification
* Frequency : 2455MHz / Air Cooling/ Pre-Heating Time : 8 Sec* High Temperature Reacting for Metal Sintering, Melting and Dielectric Materials* Total Spec and Size may be changed depending on Input Materials or Customer's needs. |
|||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Microwave Si-Wafer Sintering Vacuum Furnace
LUS102WMF
|
■ Electrical Specification
* Frequency : 2455MHz / Air Cooling/ Pre-Heating Time : 8 Sec * Manufactured for Sintering and Reaction of Semiconductor Silicon Wafers (Si-Wafer 8") Manufacturing Methods and Conditions may Change Depending on Input Materials. |
---|
Magnetron Head
LUS246MH (Air Cooling)
|
■ Instrumental Specification
* Frequency : 2455MHz / Air Cooling/ Pre-Heating Time : 8 Sec* Manufactured for Safe and Easy Integration of Magnetron Drive into Microwave Equipment. |
||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
LUS286MH (Air Cooling) |
■ Instrumental Specification
* Frequency : 2455MHz / Air Cooling/ Pre-Heating Time : 8 Sec* Manufactured for Safe and Easy Integration of Magnetron Drive into Microwave Equipment. |